Red Line Extension to Mattapan

The Mattapan High Speed Line is old and difficult to maintain. MBTA is currently looking at future options on how to maintain transit service along that corridor. As far as I know, there are 4 options:

  • Do nothing, and continue to maintain the PCCs.
  • Replace with a modern light rail vehicle.
  • Replace with bus service.
  • Extend the Red Line

I haven’t seen much discussion on that last option, so this post aims to be a comprehensive view on what it would look like. It’s a mix of collecting others’ discussions and some original ideas.

I think it’s a good idea, so I talk pretty glowingly about it, but this is meant to inspire conversation rather than convince you that it’s the best plan.

Visit Now

Tags: Line Red